PTC WB-224B Bridge Slide

Advantage Steel and Construction was involved in sliding the first bridge into place on the PA Turnpike. Advantage Steel erected the eastbound and westbound bridges over Brush Creek, just south of the existing turnpike bridges. The erection occurred on a temporary support system Advantage Steel designed and made to slide the bridge in to place.

During a weekend closure, after Brayman Construction removed the existing bridge, Advantage Steel slid both the Eastbound and Westbound structures into place and lowered them onto the existing abutments and pier.

2017 ABCD Outstanding New Multiple Span Bridge Award Winner

2018 IWEA Jack Daley Safety Award Winner

Key Construction Elements:

  • Temporary Support Systems
  • Bearing Replacement
  • Jacking
  • Work Alongside Live Traffic
  • Steel Repairs
  • Core Drilling
  • Stringer Repairs
  • Shear Connector Installation

General Work Activities:

  • Steel Erection
  • Temporary Support
  • Jacking
  • Fabrication
wide
wide
medium
medium
No items found.

Transforming Construction Projects with Expertise

Advantage Steel and Construction offers diverse capabilities for complex steel construction projects.
Contact us to day to see how we can help you with your next project.