McKnight Rd Rehab
McKnight Rd Rehab
Advantage Steel and Construction performed extensive rehabilitation work on multiple bridges in a small corridor along SR 4003. The difficult steel work all took place around live traffic and in tight work areas. The project included diaphragm and stiffener replacement, along with over 75 bearing replacements.
Designed temporary support systems were installed during repairs to ensure bridge stability throughout the duration of the job. All work required precise planning , coordination, and construction engineering to allow for the expansive repair work to be performed without impacting the traveling public.
Key Construction Elements:
- Temporary Support Systems
- Bearing Replacement
- Jacking
- Work Alongside Live Traffic
- Steel Repairs
- Core Drilling
- Stringer Repairs
- Shear Connector Installation
General Work Activities:
- Steel Rehabilitation
- Temporary Support
- Jacking
- Fabrication
Related Projects
Transforming Construction Projects with Expertise
Advantage Steel and Construction offers diverse capabilities for complex steel construction projects.
Contact us to day to see how we can help you with your next project.