Advantage Steel and Construction performed the erection of 12,100,000 lbs. of structural steel over the Allegheny River. Erection of the multi-girder bridge was performed with land and marine-based crawler cranes. Multiple falsework towers and tie-down systems were installed to stabilize the girders, with haunch girders over 21’ deep and weighing over 150,000 lbs. The main channel span was pre-assembled on sectional barges, which were 60’ x280’ and weighed over 1,050 tons. The barges were then floated into place, and the single unit, weighing over 2 million pounds, was strand-jacked into position to avoid interfering with river traffic.

2016 ENR Merit Award Winner

2016 Jack Daley Safety Award Winner

Key Construction Elements:

  • Strand Jacking Erection
  • Erection with 4100SIII Ringer Crane
  • Erection of Girders w/ Horizontal
  • Splices
  • Water Erection
  • Difficult Weather Conditions
  • Aggressive Schedule
  • Temporary Support Systems
  • Strand Jacking
  • Critical Lifts
  • Walkway Fabrication

General Work Activities:

  • Steel Erection
  • Innovative Solutions
  • Temporary Support
  • Jacking
  • Fabrication
wide
medium
medium
wide
No items found.

Transforming Construction Projects with Expertise

Advantage Steel and Construction offers diverse capabilities for complex steel construction projects.
Contact us to day to see how we can help you with your next project.

No items found.