Advantage Steel performed erection of the single span bridge for High Steel and Brayman Construction.  The erection required a stiffening girder to stabilize the girders during erection.  Advantage also installed bearings and shot studs on the project.

Key Construction Elements:
  • Temporary Support

  • Jacking

  • Construction Engineering & Design

  • Critical Lifts

  • Erection over Railroad

General Work Activities
  • Steel Erection

  • Innovative Solutions

  • Temporary Support