Rodney Staton Bridge

Precast Panel Erection

Steel Rehabilitation

Location:

Wyoming County, WV 

Owner:

WVDOH

General Contractor:

Brayman Construction Corporation

Completion Date:

November 2014

The design/build rehabilitation of the Rodney Staton Bridge in Wyoming County, WV required extensive structural steel repairs and precast panel installation. Half width construction took place, allowing an 11 foot live lane to be utilized during the duration of the job. Temporary support systems were engineered to repair girders and replace bearings along the 630 foot structure. After completion of the steel repairs, precast concrete panels were installed and adjusted to grade. The concrete panels were then post tensioned in place, becoming the first ever post-tensioned precast deck panel bridge built in the state of West Virginia.

Key Construction Elements:
  • Bearing Replacement

  • Precast Panel Installation

  • Post Tensioning

  • Temporary Supports

  • Jacking

  • Work Around Live Traffic

  • Erection

General Work Activities
  • Steel Erection

  • Steel Rehabilitation

  • Temporary Support

  • Jacking

  • Demolition