Advantage Steel and Construction was involved in sliding the first bridge into place on the PA Turnpike. Advantage Steel erected the eastbound and westbound bridges over Brush Creek, just south of the existing turnpike bridges. The erection occurred on a temporary support system Advantage Steel designed and made to slide the bridge in to place.
​
During a weekend closure, after Brayman Construction removed the existing bridge, Advantage Steel slid both the Eastbound and Westbound structures into place and lowered them onto the existing abutments and pier.
Key Construction Elements:
-
Temporary Support Systems
-
Bearing Replacement
-
Jacking
-
Work Alongside Live Traffic
-
Steel Repairs
-
Core Drilling
-
Stringer Repairs
-
Shear Connector Installation
General Work Activities
-
Steel Erection
-
Temporary Support
-
Jacking
-
Fabrication