Advantage Steel, in a joint venture with Brayman Construction, has started rehabilitation work on the second of the "Three Sisters" bridges in the city of Pittsburgh. A similar scope to the 7th Street Bridge, Advantage is performing miscellaneous steel repairs throughout the structure, while the deck is replaced and the entire bridge is repainted. The project is scheduled to be completed in August of 2020.
Key Construction Elements:
-
Bearing Replacement
-
Rivet Replacement
-
Temporary Support Systems
-
Pin Replacement
-
Jacking
-
Floorbeam Repairs
-
Construction Engineering
-
Diaphragm Replacement
-
Fabrication
-
Shear Connector Installation
General Work Activities
-
Steel Erection
-
Steel Rehabilitation
-
Innovative Solutions
-