James Rumsey Bridge Replacement

Location: Shepherdstown, WV
Owner: WVDOH
General Contractor: Brayman Construction Corp.
Value: $2,000,000

This project consisted of the erection of a three-span, steel girder bridge that stretched 1,097ft in length, over the Potomac River. The new bridge contained 44 girders ranging from 14 to 18ft and also required 20 by 90ft long haunch girders that weighed 75 tons each.