Ices Ferry

Location: Cheat Lake, WV
Owner: WVDOH
General Contractor: Brayman Construction Corporation
Value: $426,075

This project consisted of the erection of 1,222 tons of steel on the 960ft long, four span bridge over Cheat Lake. The work completed on this structure utilized four different cranes; two cranes based on land and two cranes staged on barges. The erection was completed on May 31, 2012. The extensive use of barges for erection and temporary support brackets for the pier girders were required for this project.